Building projects

Throughout the years, The Vikingeskibsmuseet's boatyard have completed a wide range of construction projects. The aim is to explore the ships' construction and sailing skills, as part of the experimental archaeological research.

Present and previous at the Boatyard

Cleaving oak for Skuldelev 5: Tuesday 11/7 from 10:00

Created by Rikke Tørnsø Johansen

The boatbuilders are cleaving oak for Skuldelev 5: Tuesday 11/7 from 10:00

Launch of a new Viking ship May 7th 2022

Come and join us for the launch of a new Viking ship

Created by Rikke Tørnsø Johansen

Come and join us for a day of celebration at the Viking Ship Museum boatyard on Saturday May 7th.

Launch of a new Viking ship May 7th 2022

Skuldelev 3 revisited: a window to the past

Created by Tríona Sørensen / Rikke Johansen

The new reconstruction of Skuldelev 3 has already provided many new insights on Viking Age boatbuilding during the…

Launch of a new Viking ship May 7th 2022

Newly built Viking ship provides a window to the past and new insights for research into Viking Age society

Created by Tríona Sørensen / Rikke Johansen

The new reconstruction of Skuldelev 3 has already provided many new insights on Viking Age boatbuilding during the…

Skuldelev 3 Revisited - a new Viking ship is being built at the Viking Ship Museum's boatyard. Construction will be completed in September / October 2021.

Iron in the Viking ships - rivets and roves

Created by Tríona Sørensen

The Vikings used iron rivets and roves when they build their ships. But in the construction of the Skuldelev 3…

From 2007 – 2008, Sea Stallion undertook a trial voyage from Roskilde to Dublin and back again. 2,482 sea miles were sailed along Viking Age sailing routes with the aim of testing the reconstruction.

Sea Stallion begins to show its age

Created by Rikke Tørnsø Johansen

15 years doesn’t sound like much of an age but for a Viking ship, which has sailed thousands of sea miles, it’s…

Cleaving day at the boatyard

Created by Rikke Tørnsø Johansen

The massive 12 meter long oak log has been cleaved into to halves, but the work doesn't stop there.The boatbuilders…

200 year-old-oak to be cleaved at the Viking Ship Museum.

Created by Rikke Johansen

The massive 8 meter long oak log, with a weight of around 8 tons, will be cleaved with mallets, wedges and raw…

Delivery of massive oak logs to the Viking Ship Museum’s boatyard

Created by Rikke Johansen

Two 200-year-old oak logs – one of which weighs over 6 tons – will arrive at the Viking Ship Museum’s boatyard on…

A Viking ship built from 200 year old fleet oak

Created by Ivan Jokabsen

The construction of a Viking ship requires the best materials - not least the first class oak timber.

Film: Launch of the Viking Ship Museum's latest boat, 'Storkjoven'

"May the ship be easy for the oars, fast from the wind, but do not run from its skipper"...

Watch the film from…